On October 25th, the Beijing Municipal Urban Management Commission publicly solicited opinions on the "Beijing New Energy Storage Power Station Operation Supervision and Management Measures (Trial)", which clearly requires large and medium-sized energy storage power stations to establish a status operation and warning prediction platform, and small energy storage power stations to achieve status operation monitoring and real-time monitoring of system operating conditions.
Among them, Article 11 of the draft for soliciting opinions clearly states that "large and medium-sized energy storage power stations should establish a platform for state operation and early warning prediction, and should be equipped with active safety systems, and set up in the same place as the fire control room. Small energy storage power stations should achieve state operation monitoring and real-time monitoring of system operating conditions
Yunzhan Technology focuses on energy storage safety and has independently developed the technology and series of products for "active safety monitoring and early warning of energy storage power stations". Welcome to inquire and exchange ideas.
Attached original text link:Clear requirements for handling energy storage accidents! Soliciting Opinions on the Supervision and Management Measures for the Operation of New Energy Storage Power Stations in Beijing (Trial)